Field notes: the inlet where three licence holders all claimed the same water

Every licensing office has one of these inlets. Narrow enough that three operators can plausibly eye the same stretch, deep enough that someone always wants a few more pens in it, and shaped in a way that makes the old paper boundary descriptions genuinely ambiguous once you try to hold them up against what's floating out there.
The one I'm thinking of isn't unusual in the details, which is sort of the point. Licence A was drawn off a 2009 site survey, coordinates good to maybe ten metres by the surveyor's own admission. Six years later, Licence B came in, described relative to a navigation marker that's since been moved twice by the harbour authority. Then came Licence C, a transfer: inherited boundaries from an operator who'd gone under, with paperwork that referenced a sketch map nobody could find the original of. Three licences, three different ideas of where the water starts and stops, and for years it didn't matter because nobody was pushing the edges.
Then someone expanded. A longline array that used to sit comfortably inside one boundary grew a run of extra lines, and the new lines drifted into what the neighbouring operator considered their water. Nobody moved anything overnight. It crept, the way these things do: a replacement anchor set a bit wide, a new raft added at the end of a row because that's where there was room, a gear change that nobody thought needed a fresh application because the footprint "hadn't really changed."
By the time it landed on a desk as a complaint, the task wasn't adjudicating a dispute so much as establishing a fact nobody had: what's actually out there right now, measured against what was ever granted. That's a harder question than it sounds. Site visits answer it for one day, for whichever stretch the inspector had time to cover, logged by hand or on a tablet that doesn't always sync before the boat's back at the dock. Three overlapping licences means three separate paper files, three separate coordinate sets, and in this case, three separate ideas about what the original intent even was.
What settled it was laying the as-granted boundaries over a structure-by-structure picture of the water, not more back-and-forth with the operators. The overlap turned out real, but smaller than anyone had argued: maybe a fifth of what Operator C believed, and twice what Operator A had assumed. Once the footprint was drawn as a shape instead of described as a grievance, the conversation changed. People argue less about a polygon than they do about a feeling of having been wronged.
The part worth sitting with is how long the ambiguity sat there doing nothing until someone pushed on it. A coastal licence area with overlapping historical grants is a quiet liability until the day gear gets crowded or a new entrant wants in, and then it's suddenly everyone's Tuesday. The inlets most likely to produce this are the ones with layered licensing history: original grants, transfers, boundary amendments that were never resurveyed, informal expansions nobody flagged because the gear "basically" stayed in place.
None of that gets fixed by writing tighter permit language going forward. It gets fixed by knowing, on a given day, where every pen, raft and longline in the area sits, and checking that against the file instead of against memory or against whoever complained loudest. That's a different exercise than a dispute hearing. It's closer to bookkeeping: a routine pass over the licence area that tells you what's where, so the overlap question has an answer before it turns into three operators each convinced the others are the ones encroaching.
If you've got an inlet like that sitting quietly on your own list of things to deal with eventually, a quarterly footprint layer over the licence area is a reasonable way to get ahead of it before it becomes next year's complaint file.